Show transcribed image text The Value-Stream Map (VSM) of a simple, single-shift, 5 station production line has the following data that defines the current state: Customer demand is 7, 200 units per month (assume 20 production days per month). Inventory accumulations between the work stations are: 2250, 2600, 1800, and 2350 units. A vailable daily work time is 7 hours (breaks & lunch removed). Actual measured production rate is 40 units per hour. a. What are the customer daily requirements in units per day? __ ___ units/day b. What is the lead time based on the inventory levels from the current state map and the customer daily requirements? ___ ___ days c. Convert the customer daily requirements from units/day to takt time in seconds per unit; and, compare it to the actual rate in seconds per unit that was measured; and, then conclude whether or not the line is producing at too low a rate or at a sufficient rate to meet the customer demand. Takt time = __ ___ sec/unit Actual time per unit (convert 40 units/hr to sec/unit) = ___ ___ sec/unit Compare Takt time to actual time per unit. Can line meet customer demand?

The Value-Stream Map (VSM) of a simple, single-shift, 5 station production line has the following data that defines the current state: Customer demand is 7, 200 units per month (assume 20 production days per month). Inventory accumulations between the work stations are: 2250, 2600, 1800, and 2350 units. A vailable daily work time is 7 hours (breaks & lunch removed). Actual measured production rate is 40 units per hour. a. What are the customer daily requirements in units per day? __ ___ units/day b. What is the lead time based on the inventory levels from the current state map and the customer daily requirements? ___ ___ days c. Convert the customer daily requirements from units/day to takt time in seconds per unit; and, compare it to the actual rate in seconds per unit that was measured; and, then conclude whether or not the line is producing at too low a rate or at a sufficient rate to meet the customer demand. Takt time = __ ___ sec/unit Actual time per unit (convert 40 units/hr to sec/unit) = ___ ___ sec/unit Compare Takt time to actual time per unit. Can line meet customer demand?

Open chat
Lets chat on via WhatsApp
Hello, Welcome to our WhatsApp support. Reply to this message to start a chat.